PCB and electronic assemblies
Component bonding, reinforcement, protective material application and encapsulation around the board geometry. Access to the dispense point and permitted material spread need to be reviewed with the actual assembly.
INDUSTRIAL AUTOMATIONEquipment & application review
Yoson coordinates industrial dispensing equipment for manufacturers that need repeatable adhesive paths, controlled material delivery or a dispensing step integrated into production. The configuration starts with the part and material: a desktop platform, a vision-guided workstation and an in-line system solve different production needs.

Application fit
Review the material and workpiece, select the motion and material-supply concept, define the fixture and loading method, then agree on a sample trial and acceptance criteria. A machine proposal should describe both the dispensing process and how parts enter and leave the station.
Component bonding, reinforcement, protective material application and encapsulation around the board geometry. Access to the dispense point and permitted material spread need to be reviewed with the actual assembly.
Programmed beads and sealing paths on housings, covers, filters and other components. Review path continuity, part location, start and stop points and the required inspection method.
Metering, mixing and filling for applications using two-part materials. Material ratio, usable working time, fill quantity and cleaning requirements must be confirmed before selecting the supply system.
Configuration decisions
Consider a standard motion platform when the workpiece fits its envelope and loading can remain manual. Share the actual part height and dispensing path as well as overall dimensions.
Evaluate camera positioning when part placement or orientation varies. Samples and visible reference features are needed to assess localization; vision does not replace material-process testing.
Consider connected stations when loading, dispensing, curing or inspection must work within a production sequence. Define handshakes, handling and target output together.
Start the technical review
Share the information you already have. We will identify what still needs to be confirmed before a configuration and quotation can be prepared.
Send project information →Process reference
Use the operating reference to explain a similar step in your production. Send your own part and process video so differences in fixtures, handling and acceptance can be reviewed.
View more automation processes →Before you specify
Material compatibility depends on the valve, supply system, seals, temperature requirements and process. Share the adhesive data sheet and intended result so these items can be checked together.
Sample evaluation can be coordinated where the application requires it. The samples, material, trial scope and acceptance method are agreed for the project before testing.
Application review and delivery are coordinated from Dongguan. Standard equipment availability, remote guidance and any on-site assistance are confirmed for the specific destination and project. See the regional pages for further information.
Review the regional information and send your application in your preferred language.
Download the English dispensing equipment catalog (PDF) ↗Application review
Share product photos, drawings or a process video together with your target cycle time, output and quality requirements. We will help define a practical next step.